1. |
Set pump and tank on a solid foundation, a concrete slab or block. |
2. |
Install Jet on suction pipes and connect to pump. Clean out pipes
thoroughly. |
3. |
Prime pump to service out-let. |
4. |
Connect wires from fuse box to pressure switch and check for correct
voltage. |
5. |
Connect service out-let. (For best results, use a cut-off valve
at tank) |
6. |
Ground pump by attaching wire to one of the 4 motor mounting bolts
and connect to pipe or rod driven ground from 4 to 6 feet. |
7. |
Install air volume control and snifter valve. Leave cap on snifter
valve and air line off. |
8. |
Turn on power and allow pump to build up pressure and shut off. |
9. |
If there are no leaks in connections, install air line. Let the
pressure off and allow pump to build up pressure again. This time,
the pump may run longer to equalize the air pressure in tank. |